Questions acceptance of the equipment with the purchase of a concrete plant

A concrete plant, also called RBU (mortar-concrete unit) and BSU (concrete-mixing plant), is an automated complex for the production of concrete. It will be possible to ensure the required parameters of the concrete produced only by using high-quality equipment and high-precision batchers. These two main factors should be taken into account by an entrepreneur in the process of selecting and purchasing a concrete plant.


A comparison of the specifications of the offer and upon delivery


A comparison of the specifications of the offer and upon delivery


At the stage of selecting equipment and a supplier, the buyer proceeds from the calculated indicators of the enterprise’s future production activities, providing him with a return on investment within the planned period. A RBU of appropriate performance and an equipment supplier who sells it at an affordable price are selected.

When preparing a supply contract with a supplier, the conditions for incoming inspection and acceptance of the purchased RBU are negotiated. From the practice of selling equipment on the Russian construction equipment market, it is known that the most convenient way to purchase concrete mixing equipment is to purchase directly from the manufacturer, for example, from ZZBO. In this case, the customer is given the opportunity to carry out incoming inspection and acceptance directly at the ZZBO warehouse or after delivery of the BSU to the site of operation.

Unfortunately, often the sellers of concrete plants, who have taken on the functions of an intermediary, present the buyer with a purchase that is not in the same configuration and quality as was promised. In order to minimize the risks of operating such a batching plant and avoid unforeseen costs for modifications or equipping with additional options, the buyer needs to carry out acceptance control of the equipment intended for it. The buyer must carefully check the units, mechanisms and parts for compliance with the established reliability and quality requirements. Principle: “Trust, but verify!” is dominant in the process of accepting purchased concrete mixing equipment, for which a lot of money was paid.


Supplied concrete plant


The equipment included in the BSU is designed to provide a full technological cycle for preparing concrete - from receiving and temporary storage of the cement binder component and inert aggregates to unloading the finished concrete mixture. The basic package of the RBU includes the following functional modules:

  • concrete mixer complete with skip hoist or conveyor for loading components;
  • dosing complex with bunkers and inert dispensers;
  • dispensers for cement, water and chemical additives;
  • cement silo;
  • auger for feeding cement from the silo to the dispenser;
  • metal structures (overpasses, fences);
  • control panel and control automation system.

To ensure long-term trouble-free operation of the BSU, each functional module is subject to certain quality and reliability requirements. Let's look at the main ones.


Requirements for the mixer


Concrete mixers are the most critical and expensive units of concrete plants. The smooth operation of the entire enterprise depends on their reliability. The working elements of a concrete mixer operate under conditions of powerful abrasive action, so they must be made of certified wear-resistant, high-strength materials. Only in this case will the production of a high-quality homogeneous concrete mixture be ensured.

When accepting the concrete mixer, you must ensure that the following conditions are met:

  1. The concrete mixer must be a forced two-shaft one with horizontal shafts. If the supply of a single-shaft or gravity mixer was not agreed upon in advance in the supply contract, then their appearance in the BSU set can be considered a gross attempt to deceive the buyer.
  2. The hull armor, blades and spokes must be made of wear-resistant cast iron. The armor is attached to the hull with bolts. Ordinary steel armor welded around the perimeter of the mixing bowl is not permitted. Often, instead of wear-resistant cast iron, 09G2S steel is used for the manufacture of blades and spokes, which is also unacceptable.
  3. The armor must cover the entire perimeter of the mixing bowl. A low-quality or counterfeit mixer has armor only in the lower part of the concrete mixer.
  4. The drive of a high-quality mixer is powerful enough to meet the required performance. An unscrupulous supplier installs a low-power drive with a cheap gearbox made of low-quality materials.
  5. The lubrication system in models of leading brands is automatic. It is simply not available in counterfeit goods.
  6. You should pay attention to the pneumatic seal - it should be double reinforced, manufactured by leading brands. An inattentive buyer may agree with the supplied single pneumatic cylinder, but then will bitterly regret it.

Requirements for metering complexes


Requirements for metering complexes


  1. The drum must be equipped with a drive of the declared power.
  2. The drum must have a lining installed, otherwise the unlined drum will fail in the near future.
  3. Load cells must be of the suspended type. Installation of the conveyor on floor sensors is not allowed.
  4. The type and number of load cells must be in accordance with the specification.
  5. There should be a vibrator on the cement dispenser to avoid sticking of the dispenser.
  6. A drain pump must be installed on the water dispenser.

Requirements for silos


A silo is a container designed for temporary storage of cement. A silo can perform its functions as a unit that quickly and easily supplies dosed portions of cement to a concrete mixer only in conjunction with technical devices that the supplier offers as additional options. The main nuance here is the likelihood of the supplier replacing high-quality branded products with cheap counterfeits. The buyer must ensure the availability of the following components and mechanisms from leading manufacturers (mainly Italy):

  • emergency pressure relief valve;
  • disc valve;
  • cement level sensors;
  • aeration and vibrator systems;
  • cement filter (preferably MAXAIR);
  • silo control panel.

Requirements to the screws


The buyer must clearly understand that when using a small-diameter screw, a powerful BSU will not cope with its production program. Supplying a small amount of cement for dosing will slow down the entire technological process. The main requirements for the auger are:

  • screw diameter not less than 219 mm;
  • high drive power;
  • screw manufacturers - Italian brands.

Requirements to the screws


conclusion


Acceptance of a concrete plant from the supplier is completed by the buyer signing a delivery note, confirming the transfer of the equipment into the ownership of the buyer. The buyer has the right to refuse to accept the units provided to him, citing the non-compliance of the delivered goods (in this case, concrete mixing equipment) with the declared quality indicators. However, an entrepreneur who has already formed a portfolio of orders for the supply of ready-mixed concrete is unlikely to be satisfied with this option. He undertakes urgent improvements to the BSU at his own expense, spending significant amounts of money. Therefore, as strange as it may sound, among the main criteria for choosing a reliable concrete plant is the rating of the equipment manufacturer - its reputation, which guarantees the delivery of exactly the equipment that the buyer has chosen.