One of the most pressing problems in our country is terrible roads, or rather road surfaces. In order to solve this problem once and for all, you can address this issue yourself. Oddly enough, asphalt production in Russia is not only a relevant, but also a fairly profitable business. Firstly, there is always a need in the country to repair or lay the road surface, and secondly, the average market price of asphalt is quite attractive relative to the cost of producing the asphalt itself. In this article we will not consider manufacturing technology, but will talk about business legalization, environmental friendliness of production, necessary documents and capital investments.
So, if you have already decided to consider entering the asphalt production business, you need to follow these steps step by step:
- Select equipment for asphalt plant
- Register an LLC or individual entrepreneur
- Select OKVED code
- Select a suitable plot of land for further construction of the asphalt plant
- Prepare the plant for launch, organize a warehouse of materials
- Calculate the cost of equipment and additional costs
Selection of asphalt plant equipment
There are 3 types of clients:
- Those who have a factory and want to expand.
- Having their own fleet of equipment.
- No experience in asphalt production.
The first two groups of clients have certain experience, they know the market and what the volume of products should be. Selecting equipment for them will not be difficult.
Those who are new to this business need to first study market demand and try to predict the load volume for the season. After this, it is easy to calculate the required plant productivity. Here are the main parameters you need to know when selecting equipment:
- Performance
- Type of fuel the plant will operate on
- Type of filter unit.
Basically, the entire equipment of the plant depends on productivity, since this is the most important indicator, and all other components of the plant are selected based on this parameter by the manufacturer - the Zlatoust Concrete Mixing Equipment Plant (ZZBO). It is at the discretion of the buyer to choose the required volume of silo for storing mineral powder. Basically, this parameter is also discussed with ZZBO specialists. The client can also choose storage volumes for storing bitumen. This parameter depends on the volume of supply from the bitumen supplier.
As for fuel, if you have the opportunity on your territory to connect an asphalt burner to natural gas, then this will be an ideal option from both an economic and environmental point of view. If the client does not have such an opportunity, then the ZZBO company will offer a choice of burners for diesel, stove and fuel oil. There are enough suppliers of these types of fuel in our country, and you can easily solve this issue.
As for filter units, the most popular and in demand today are the following 2 types:
- Installations based on bag filters
- Cyclone dust collectors with a “wet cleaning” unit
The cost of bag filters is significantly high. In addition, they require further maintenance costs. But in terms of cleaning efficiency, these installations are in first place with a result of 99% or more, depending on the filter material used. The use of bag filters significantly reduces the amount of harmful emissions into the atmosphere.
Cyclone dust collectors with a “wet cleaning” unit are cheaper both when purchased directly and during further maintenance, but the result of their cleaning efficiency is 90-91%.
The choice in favor of one or another installation always depends on the location of the plant, the productivity of the plant, the requirements for ensuring the quality of atmospheric air and the maximum permissible concentration of harmful substances (MPC) in a given type of area. If the client is targeting small volumes, and the site is sufficiently remote from residential buildings, then perhaps a cheaper gas purification option will be suitable. The client can always contact ZZBO specialists with this question.

Registration of an LLC or individual entrepreneur
To carry out legal activities, you must register your business as an LLC or as an individual entrepreneur. The first option is more preferable when working with legal entities.
Selecting OKVED code
According to the all-Russian classifier, we recommend choosing the following OKVED codes:
23.99.2
Manufacture of products from asphalt or similar materials
23.99.3
Production of bituminous mixtures based on natural asphalt or bitumen, petroleum bitumen, mineral resins or their pitches
Acquisition of territory for the location of asphalt plant
The territory for locating the asphalt plant is selected in accordance with the purchased equipment for asphalt production. Thus, a plant with a capacity of 80 t/h requires an area of 1000 square meters. m (for installation) and 400 sq. m (for warehouses of inert materials). In addition, you need to take into account access roads for receiving raw materials and a place for shipping finished products. Before starting construction, you should first find out about the purpose of the land and the possibility of locating industrial facilities, including an asphalt concrete plant, in this area. The land can be either your property or rented.
Preparation for installation, organization of material warehouses
When purchasing an asphalt concrete plant, the ZZBO company offers to agree on the layout of the asphalt concrete plant units and subsequently transfer to the customer the load diagram on the supports of these units. After receiving this diagram, you must contact a construction organization to prepare design documentation for the placement of foundations and their subsequent pouring.
It is also necessary to prepare an area for a warehouse of inert materials (crushed stone and screenings), the area of which depends on the productivity of the plant and the rhythm of supplies of materials. As mentioned above, at least 400 sq. m. ZZBO specialists can provide more detailed recommendations.
Equipment cost and additional capital investment
In order to calculate the necessary costs, consider, for example, a plant with a capacity of 80 t/h. The estimated cost of a plant with standard configuration starts from 20 million rubles. As a rule, the standard equipment includes a dosing complex, a drying drum and an elevator with a mixing tower. Also, depending on the manufacturer, this price may include a cyclone for filtering dust (we talked about it earlier).
If you have already worked at an existing plant and now intend to expand capacity or have purchased equipment to replace outdated equipment, then you probably have your own bitumen storage facility on your territory. Therefore, you don’t have to spend money to buy extras. equipment.
But, if you want to build a turnkey plant, then you will need to purchase additional equipment costing about 10 million rubles. This may include containers for storing bitumen, an oil heating unit, a filter unit, a compressor with increased performance, a burner for your type of fuel, containers for storing mineral powder and own dust, a container for storing fuel, a ShchMA dispenser and installation of an adhesive additive in bitumen.
ZZBO specialists are always happy to select the right equipment specifically for your needs. Give recommendations and try to find the optimal cost.
Among the additional capital investments, it is necessary to take into account the cost of preparing the territory for the installation of an asphalt plant, organizing a warehouse for inert materials, and purchasing loading equipment for loading the plant’s dosing complex.

Coordination with Rospotrebnadzor
An asphalt concrete plant is a source of harmful emissions into the atmosphere, and the installation of such a plant requires approval from the Federal Service for Supervision of Consumer Rights Protection and Human Welfare (Rospotrebnadzor).
If the decision to purchase an asphalt plant is positive, the ZZBO company recommends issuing a sanitary and epidemiological conclusion for the further legal operation of the plant in compliance with the laws of the Russian Federation. To do this, you need to find an organization in your area that specializes in environmental design. Since legislative standards in the environmental sphere often change, and it is difficult for an ordinary entrepreneur to delve into all the nuances, it is better, without wasting time and money, to seek help from this organization. The process of completing and obtaining a sanitary and epidemiological certificate lasts about six months, so you need to be patient.
Let's describe your actions step by step:
- Find an environmental design organization
- Conclude an agreement for the development of a sanitary protection zone project
- The organization develops a draft sanitary protection zone, you receive an expert opinion on this project and submit it to Rospotrebnadzor to obtain an opinion.
Regardless of the location of the territory of your plant from populated areas, you will in any case have to obtain a sanitary and epidemiological certificate. If the plant is located near residential buildings, then the project will be supplemented by an analysis of the impact of the operation of the asphalt concrete plant on human health.
According to SanPin 2.2.1/2.1.1.1200-03 “Sanitary protection zones and sanitary classification of enterprises, structures and other objects”, the production of asphalt concrete belongs to the second hazard class and the required size of the sanitary protection zone must be equal to 500 m. It is this distance that must be maintained from the territory of the asphalt plant to residential buildings. This should be used as a guide when choosing a site for placing the asphalt concrete plant in the first place. But there are situations when it is physically impossible to locate an asphalt plant at a distance from residential buildings. More modern filtration installations, which must be included in the design of the sanitary protection zone, as well as a revision of production volumes, will make it possible to reduce the size of the sanitary protection zone.”
The final result and permitting documents at the initial stage of launch should be:
- Sanitary Protection Zone (SPZ) Project
- Expert opinion on the SPZ project
- Sanitary and epidemiological conclusion from Rospotrebnadzor
ZZBO company recommends studying the main list of sources that should be mentioned in the SPZ project:
- Law of the Russian Federation “On Environmental Protection” No. 7-FZ of January 10, 2002
- Law of the Russian Federation “On the Protection of Atmospheric Air” Federal Law No. 96 of 1999
- Law of the Russian Federation “On the sanitary and epidemiological welfare of the population” No. 52-FZ of January 26, 2007
- SanPin 2.2.1/2.1.1.1200-03 “Sanitary protection zones and sanitary classification of enterprises, structures and other objects”
- SanPin 2.1.6.1032-01 “Hygienic requirements for ensuring the quality of atmospheric air in populated areas.”
- Decree of the Government of the Russian Federation of March 3, 2018 No. 222 “On approval of the Rules for the establishment of sanitary protection zones and the use of land plots located within the boundaries of sanitary protection zones”

Permission to commission asphalt plant
After receiving a sanitary and epidemiological conclusion from Rospotrebnadzor, you can begin to work and put the facility into operation. It should be remembered that a year after operation it is necessary to conduct an inventory of emissions and final approval of the project. The organization involved in your SPZ project should remind you of this. After final approval of the SPZ project, you must contact the Department of Architecture of your city to register the object on cadastral maps.
Required Personnel
To work effectively, it is necessary to select qualified personnel, preferably with experience in this field. The following specialists will be required:
- Operators (at least 2x)
- Loaders or laborers
- Forklift driver
- Accountants
- Head of ABZ
At first, you can take over the management of the plant and outsource the accounting reporting. This will reduce startup costs.
conclusion
In conclusion, I would like to repeat once again that an asphalt concrete plant is a highly profitable business. If asphalt is sold well and the asphalt plant is fully loaded during the season, the plant will pay for itself already in the second month of operation. We will not give examples of payback calculations in this article, since this requires taking into account many factors, such as: purchase of raw materials, equipment depreciation, electricity and fuel costs, taxes, staff salaries and much more. We will present this calculation in the next article.
We remind you that when purchasing an asphalt plant, you must always be guided by environmental legislation, since an asphalt plant without proper air purification is a source of air pollution.