The development of modern construction technologies refutes the previously established concept that it is impossible to carry out construction in winter. The statement about the futility of winter construction due to the negative impact of sub-zero temperatures on the quality of poured concrete is not relevant now. Based on scientific recommendations that take into account the specifics of cement hydration processes in various conditions, concrete plants produce concrete mixtures suitable for use at temperatures below zero degrees, and concrete is poured at construction sites in any weather.

Freezing of water - the cause of all the ills of concrete
The setting and hardening of concrete is ensured by the creation of spatial bonds between hydrosilicate crystals and cement particles. The presence of water is a prerequisite for the cement hydration reaction to occur. At temperatures below the freezing point of water, progressive formation of ice crystals occurs in the volume of mixed cement, preventing the mixture from hardening within the specified time frame. Moreover, freezing water increases in volume and destroys the structure of concrete that has not yet hardened. Instead of a dense, homogeneous monolith, a frozen mixture of sand, large fillers and fine ice is formed. Binder cement does not contact either the fillers or the metal of the reinforcing bars, which leads to catastrophic consequences for the building under construction.
It is important! On a construction site, frosty weather is especially dangerous for freshly laid concrete. After the laid concrete reaches 50% of its design strength, low temperatures have virtually no effect on its characteristics.
The concrete hardening period regulated by building codes is 28 days, but concrete mixtures and solutions are most sensitive to a sharp drop in temperature during the first week after pouring. The most dangerous consequences for the building structure being erected are the consequences of freezing that occurs during the setting period of concrete, that is, directly at the construction site. Only by creating conditions that prevent the freezing of water in the poured concrete will it be possible to maintain the technological discipline of construction. For these purposes, certain technologies are used on winter construction sites to allow construction work to be carried out all year round.
Optimization of conditions for concreting in winter
Work on an open construction site during the cold winter period requires special measures to protect the freshly prepared concrete mixture from possible freezing of water, which is a catalyst for cement hydration. The following technologies are most in demand:
- The use of chemical additives with a wide range of positive qualities:
- additives help reduce the crystallization point of water contained in the mixture, thereby maintaining a sufficient rate of hydration at low temperatures;
- contribute to the accelerated development of the declared strength;
- create conditions for increasing the mobility of the concrete mixture.
- Warming up using the “thermos” method while retaining the heat released during the exothermic course of cement hydration. The essence of the method is that heat is released when cement hardens. By thermally insulating the hardening mixture from external conditions, a unique microclimate is created that retains heat, which is quite sufficient for normal setting and hardening of concrete for the entire 28-day period.
- The use of insulated formwork.
- Using infrared devices.
- Electric heating using electrodes.
conclusion
The practice of using anti-frost technologies has confirmed the correctness of the decisions made to ensure the strength of building structures in winter construction conditions. Modern construction sites are ready to work year-round, ensuring the quality of work at the proper level.