The designations of most concrete plants include their nominal hourly productivity, for example, a concrete plant of the LENTA-36 brand produced by ZZBO has a productivity of up to 36 cubic meters. meters of concrete mixture per hour. In practice there are:
· rated capacity, also called design capacity, which is determined from the design features of the concrete mixer,
· actual productivity, estimated by the volume of concrete mixture produced over a long period of time - per shift, per day and other time intervals.
The actual productivity of a concrete plant is lower than the calculated one, by about 20-30%, since its indicator is influenced by various factors.
Methods of determining the productivity of a concrete plant
Theoretically, the productivity of the BSU is determined by the formula P = V/T, which uses the following notation:
· V – volume of shipped concrete mixture, cubic meters. m;
· T – time interval relative to which P’s productivity is calculated.
The main difference between the calculated and actual productivity of the BSU is the assessment of the duration of the production and technological cycle, since the real activity of the enterprise is accompanied by technological stoppages and non-production time costs.
Determination of the design capacity of BSU
The calculated productivity is determined based on the cycle duration of one batch, which consists of three parameters:
1. Standard mixing duration, which is:
· for heavy concrete 60-300 sec;
· for lightweight concrete – 300-500 sec.
2. Loading time, which is 10-15 seconds.
3. Duration of unloading, depending on:
· composition and mobility of the concrete mixture;
· type of concrete mixer and design of the loading device.
An estimated time of 30-50 seconds is allotted for unloading.
To switch to hourly productivity, use:
· geometric volume of the concrete mixer as the volume of concrete mixture produced;
· the standard number of batches/cycles in 1 hour, laid down in the design standards for concrete mixing shops, for example, for mixtures using light aggregates, 15 batches are specified;
· concrete yield coefficient.
In this case, the following conditions are assumed to be met:
· continuous automatic mode;
· working with one brand of concrete;
· summer work;
· water-cement ratio is 0.5;
· Sand moisture content is 5-7%.
Actual performance BSU
A concrete plant is a complex production and technological complex formed by adjacent functional units consisting of individual units, mechanisms, sensors and dispensers. Before the concrete components are mixed in a concrete mixer and shipped, it is necessary to perform a number of mechanized operations, the duration of which significantly expands the production time interval:
• unloading of inert fillers from the bunkers of the dosing complex for supply to dosing. In winter, unloading is complicated by the freezing of inert materials in the bunker and the need to pre-defrost them;
• unloading cement from the silo using a screw feeder;
• transportation of inert and cement for dosing;
• dosing of components before feeding into the concrete mixer;
• supply of dosed components to the concrete mixer.
To visually display the duration of each operation, cyclograms are used, on the basis of which the actual productivity of the concrete plant can be determined.
Conclusions and recommendations
The productivity of a concrete plant is influenced by the characteristics of all technical means involved in the technological chain without exception. For example, a skip can deliver dosed components for mixing faster than a conveyor. Minimizing the duration of each cycle without wasting time on non-production needs creates the opportunity to increase the number of batches within the estimated time, which directly increases the productivity of the concrete plant.